For manufacturing teams
The floor follows the recipe, step by step.
The master formula is written once, approved by QA, and run on the floor one gated step at a time. Each value is checked against its limit as it is typed, and Foresee warns before an equipment or training qualification lapses.
PCM-500 · Batch B-2411-068
Running MFR-PCM-500 v4.2 · gated by section · sample
| SECTION | GATE | STATUS |
|---|---|---|
| 3 · Dispensing | Conditions passed | Signed |
| 4 · Granulation | Values within limits | In progress |
| 5 · Drying | QA sign-off required | Locked |
| 6 · Compression | Section 5 complete | Locked |
- Checked at entry
- Each value is checked against its limit as it is typed.
- Gated by section
- A step cannot be skipped; locked sections stay visible.
- Author once
- Sections drawn from a managed template library.
Gated execution
The floor follows the recipe, step by step.
Typed capture on the floor, section gates and e-signatures. Gates block movement until conditions pass, and locked sections stay visible.
- Values captured at execution, against the cell they were defined for
- Gates block movement until conditions pass
- Numbers carry units and ranges
MFR authoring and tech transfer
Author once, reuse everywhere, see every change.
Sections come from a managed template library, and parameters are validated on save and on publish. Reviewers see what changed, version to version.
- Sections drawn from a managed template library
- Parameters validated on save and on publish
- Reviewers see the change, version to version
| PARAMETER | v4.2 | v4.3 |
|---|---|---|
| Impeller speed | 140–160 rpm | 140–160 rpm |
| Granulate hold time | 36 h | 48 h |
| Dry to LOD | ≤ 3.0 % | ≤ 2.5 % |
Equipment and training qualification
Never learn about a lapse from a blocked batch.
Qualification status lives on the equipment and people masters, and records can only reference what is qualified. Foresee warns before a qualification lapses.
- Qualification status on the equipment and people masters
- Records can only reference what is qualified
- Foresee warns before a qualification lapses
- ✓DraftedProduction authorSigned
- ✓ReviewedProduction headSigned
- 3QA approvalQA lead · meaning: approved for useWaiting
- 4EffectiveVersion can be used on the floorLocked
How it works
From master formula to a batch on the floor
- 01Recipe writtenThe master formula is written once, with the limit for every value.
- 02QA approvesQA approves the recipe before anyone can use it.
- 03Made on the floorOperators follow it step by step. A step cannot be skipped.
- 04Checked and signedEach value is checked against its limit and signed.
- 05Ready for releaseThe record is complete, so QA can release the batch.
What changes
The week before, and the week after.
TODAY
- MFRs copied from the last product and edited by hand
- Each tech transfer re-typed into a new format
- Missing or wrong entries go back to the floor for correction
- Calibration and training dates kept in a spreadsheet
WITH SYNNGULAR
- Sections drawn from a managed template library
- Reviewers see the change, version to version
- Typed capture checks each value against its range at entry
- Qualification status lives on the equipment and people masters
What manufacturing teams use
From the master formula to the floor
- MastersProducts, materials, equipment, people, and locations.
- MFR authoringStructured sections and tables, validated on save and publish.
- Templates and librariesManaged section library and clean-copy inserts.
- Approvals and qualificationsRole-bound stages and qualification tracking.
- Gated batch executionTyped capture and section gates on the floor.
- ReportScheduled digests for QA and production leads.
70%
faster modernisation cycle in Morepen's BMR dossier engagement, where agents compile the dossier.Figures measured and reported by Morepen.
Read the case studyWhere plants start
Manufacturing workflows
- Quality and ManufacturingBatch record review and releaseReview by exception instead of line by line.See the workflow
- Manufacturing and RegulatoryMFR authoring and tech transferAuthor once, reuse everywhere, see every change.See the workflow
- Manufacturing and QualityEquipment and training qualificationNever learn about a lapse from a blocked batch.See the workflow
Products
Products manufacturing teams use
- eBMRMasters, MFR authoring, staged approvals and gated execution, every change audited.
- ConnectGoverned connectors to MES, LIMS, ERP and QMS, with shared masters across sites.
- AgentsAgents run on a schedule and send each lead what changed, with the evidence attached. They never create, change or sign a record.
See it with your production team.
Bring one product and one workflow. We scope the pilot against your plant.